Skip to content
EARTH LAYERS Send your finishes schedule
Home / Specify / Acoustic plaster / Fellert Even Better 2
Seamless acoustic plaster ceiling meeting a wall with no visible joint
Acoustic plaster — technical data

Fellert Even Better 2

Acoustic plaster

Manufacturer Styjl
Country of origin Sweden
System family Acoustic plaster
Supplied and applied by Earth Layers by Conmarble

The product

Acoustic plaster made from recycled cotton fibres and perlite, used as the top coat for the Silk finish. Sprayed and trowelled at approximately 1.5 mm wet.

Where it is used

Top coat for the Silk finish Top coat for the Silk Metallic finish

Substrates

16 mm (5/8") regular gypsum wallboard Metal ceiling grid at 400 mm or 16" centres, as constructed for 16 mm commercial drywall Concrete Previously painted substrates

Application data

Coverage, thickness, mix and cure, as declared by the manufacturer. Site conditions in the Gulf sit at the top of most of these ranges — allow for it in the programme.

Type Acoustic plaster, recycled cotton fibre and perlite
Applied wet thickness Approx. 1.5 mm (1/16")
Silk finish coverage 20 m² (200 sqft) per bag
Calculated waste 5%
Packaging 5 kg (11 lb) bags
Shelf life 2 years, stored dry and out of direct sunlight

Performance data

Every figure below is reproduced from the manufacturer's own technical data sheet, with the test standard it was measured against. The sheet itself is in the download section.

PropertyResultStandard
Recycled content 40% Fellert Even Better 2 data sheet
Pot life 12 – 18 hours Fellert Even Better 2 data sheet
Frost Powder product unaffected by frost Fellert Even Better 2 data sheet

Where not to use it

The limits are as much a part of the specification as the performance. Everything here is stated on the manufacturer's data sheet.

Pot life of 12 to 18 hours. Wear a respirator when mixing the dry powder. Wear eye protection at all times. Interior use as part of the Even Better system.
Specification clause

Acoustic plaster top coat: Fellert Even Better 2 by Styjl, mixed with water and applied by spray machine and trowel to approximately 1.5 mm wet thickness, as the Silk finish coat.

Square brackets mark the choices that belong to the project. Send us the finishes schedule and we will return the clause completed, with the sample and mock-up programme against it.

Documents

Every document is the manufacturer's own, reproduced in full and unaltered under our cover. Free to download, no form.

Fellert Even Better 1 PRODUCT DATA SHEET · 0.3 MB
Download (PDF, 0.3 MB)
Fellert Even Better 2 PRODUCT DATA SHEET · 0.3 MB
Download (PDF, 0.3 MB)
Fellert Even Better Access Panel PRODUCT DATA SHEET · 0.1 MB
Download (PDF, 0.1 MB)
Fellert Even Better Acoustical Coating PRODUCT DATA SHEET · 0.2 MB
Download (PDF, 0.2 MB)
Fellert Even Better Board Adhesive PRODUCT DATA SHEET · 0.1 MB
Download (PDF, 0.1 MB)
Fellert Even Better C-Channel PRODUCT DATA SHEET · 0.1 MB
Download (PDF, 0.1 MB)
Fellert Even Better Primer PRODUCT DATA SHEET · 0.1 MB
Download (PDF, 0.1 MB)
Fellert Even Better Primer Additive PRODUCT DATA SHEET · 0.2 MB
Download (PDF, 0.2 MB)
Fellert Even Better Spring Washer PRODUCT DATA SHEET · 0.1 MB
Download (PDF, 0.1 MB)

The rest of the

Fellert Even Better Silk Seamless acoustic plaster Fellert Even Better Sahara Seamless acoustic plaster Fellert Even Better Secern Seamless acoustic plaster Fellert Even Better Concrete Seamless acoustic plaster Fellert Even Better New England Seamless acoustic plaster Fellert Even Better Silk Metallic Seamless acoustic plaster Fellert Even Better Marble Seamless acoustic plaster Fellert Even Better Stone Seamless acoustic plaster Fellert Even Better 1 Acoustic plaster Fellert Even Better Acoustical Coating Acoustic coating Straight Up 20 mm Seamless acoustic ceiling and wall system Straight Up 15 mm Seamless acoustic ceiling and wall system

Technical support for the design team

We supply the material and we apply it, so the specification and the workmanship sit with one party. Send a finishes schedule, an elevation or a mood board and we will come back with the system, the build-up, the sample programme and a completed clause.

Send your finishes schedule Visit the showroom
Continue
Delivered projectsWhere this system is already installed.The specification hubEvery product, family and document in one place.Upload a scheduleSend a finishes schedule or bill of quantities for review.See it in personEvery range on real walls, by appointment.