The four emirates
Each one asks something different of a finishes schedule. These are the differences that actually change what we send you.
Dubai
Our baseEarth Layers Building Contracting operates from Office F27, Saih Shuaib 2, in Dubai Industrial City, and the unfired Clayworks range is held here for the region. Dubai also sets the tightest compliance path of the four: under Al Sa'fat, Dubai Municipality's green building system, Silver Sa'fa is mandatory on every building in the emirate, which puts emissions and material origin on the schedule from concept stage. Our built work here includes Villa 515 in Jumeirah and the Canvas Events Pavilion.
Abu Dhabi
Everything is ratedEvery new building in the emirate carries a rating. Abu Dhabi's Estidama programme and its Pearl Rating System have required at least 1 Pearl on all new buildings since 2010, and at least 2 Pearl on government-funded ones, so a wall finish arrives with paperwork attached rather than a sample board alone. We have supplied and installed in the emirate — that work is not published by name — and we state the status of every certificate we hold — including the Clayworks Environmental Product Declaration that expired in November 2025 and is being renewed.
Sharjah
Where our earth walls standSharjah holds land on both the Arabian Gulf and the Gulf of Oman, and our walls are on the eastern shore. At Kalba Beach we built in-situ stabilised rammed earth for Shurooq, the Sharjah Investment and Development Authority — a public-realm beachfront site metres from the sea, with the roof slab craned onto the completed walls once they carried their own load. It is our built rammed earth reference in the Emirates.
Al Ain
The country's earth-building heartlandThe Cultural Sites of Al Ain — Hafit, Hili, Bidaa Bint Saud and the Oases Areas — were inscribed on the UNESCO World Heritage List in 2011, the first World Heritage property in the country, and the oases preserve historic mudbrick structures still watered by aflaj. Al Ain sits within the Emirate of Abu Dhabi, so its projects fall under the same Pearl regime. We have not built in Al Ain yet. If a project comes, we would start where we always start: a mix trial and a mock-up on your site.
What does not change
The rating system changes at the emirate border. The way the work is delivered does not.
Beyond the Emirates
Earth Layers is the UAE entity of the group. Sister companies deliver the same catalogue and the same crews in Saudi Arabia and in Qatar, where the company began in 2020. Our crews built the UAE Pavilion at Expo 2023 Doha in in-situ rammed earth, and the guest buildings, mosque, minaret and boundary walls at Al Kaaban Resort.
Featured projects
Built with this material, by our own artisans. Open the project for the full set of photographs and the story of the installation.
Tell us where the project is
Send the finishes schedule with the emirate on it. We will come back with the specification clauses, the samples, the documents that belong with them and an honest answer on what belongs where.


